IMG 2588 v2

Previous Works

View our previous works galleries by clicking on the images below.

Pirbright & Brookwood 2018/2019

Pirbright & Brookwood 2018/2019

2 schemes in one package to install Kingpost wall at Pirbright with Brookwood being sheet piling water cut off with Gabion baskets and Reno mattress to stabilise slopes.
Hook Road (Epsom) 2017

Hook Road (Epsom) 2017

Earthworks project to fix failing embankment behind houses. Crib wall was installed by hand with the use of a 5T excavator to fill due to limited working room in 3rd party owners garden.
Foxhill 2017

Foxhill 2017

Drainage scheme to divert surface water away from embankment in times of high flooding.
Upper Halliford 2016

Upper Halliford 2016

The scheme was to install new bases with lighting columns and cabling duct routes to station along with associated walking routes.
Swaythling 2015

Swaythling 2015

The scheme was to create drainage to embankment and toe with slope stabilisation.
Pink Hills 2015

Pink Hills 2015

Embankment stabilisation – soil nailing with Crest Gabion baskets secured with nails.
Pinks Hill

Pinks Hill

Emergency earthworks scheme to reinstate the embankment after train speeds were restricted to 5mph. The scheme involved a gabion baskets solution with 6N fill to the embankment.
Eastleight UTX

Eastleight UTX

In 2016 a 4 road UTX was undertaken over 24hrs to provide route for new HV cabling.
train image

To find out more about our services, get in touch today.

Contact Us